Our group is active in many fields as a multidisciplinary and innovative contractor since over 20 years:

service 0

Roads

service 1

Water & Wastewater

Buildings

Industrial Projects

Solar Energy

RECENT PROJECTS

All Projects in PDF


Arab Brothers offers a comprehensive contracting service in civil engineering, infrastructure projects and Solar Projects .Our staff of engineers, construction managers, business professionals, and skilled tradesmen plays an important role in ensuring successful project deliveries and unmatched client satisfaction. Our project history includes numerous general construction contracts valued from $25,000 to $14,000,000.We have successfully delivered over twenty-five projects in the last ten years’ worth a total of $75,000,000. Our experience records for the last ten years feature several major projects that were successfully implemented and completed with different clients USAID /AFD /WB/KFW /Rawabi/Anera/Municipalities. As with all of our projects, these projects were completed on time, within the agreed budget, and up to Clients satisfaction.Read More


53KWp Villa’s Solar Project – Wheeling System

53KWp Villa’s Solar Project – Wheeling System

More Photos PDF File
Location:Aldahriya
Owner:Private property
Finance:Arab Brothers Group
Clients:Arab Brothers Group
Value: 50,000 $
Starting On: 2020
Ending On: July 2020
Duration: 5 Months

53 Kwp wheeling project in Hebron, Dahiriyah. It supports three electricity consumers belonging to the Naser family. The equipment is based on Canadian Solar polycrystalline modules, Lorenze mounting structure, and SUNGROW inverters. This project generate aprox. 300 kw daily.

300KWp FIP Photovoltaic Power Station – Net Metering

300KWp FIP Photovoltaic Power Station – Net Metering

More Photos PDF File
Location:Aldahriya
Owner:Future Iron Pipes
Finance:Future Iron Pipes
Clients:Future Iron Pipes
Value: 250,000 $
Starting On: 2020
Ending On: July 2020
Duration: 5 Months

300 KWp Net-metering project in Hebron, Dahiriyah. It supports Future iron pipes factory. The equipment is based on Canadian Solar polycrystalline modules, Lorenze mounting structure, and SUNGROW inverters. This project generate aprox. 1400 kW daily.

995KWp FIP Photovoltaic Power Station Plant

995KWp FIP Photovoltaic Power Station Plant

More Photos PDF File
Location:Aldahriya
Owner:Arab Brothers Group
Finance:Arab Brothers Group
Clients:Arab Brothers Group
Value: 800,000$
Starting On: 2020
Ending On: December 2020
Duration: 6 Months

995 Kwp investment project in Hebron, Dahriyah will be installed above future iron pipes buildings. It supports SELCO network with MV switch gear and step up transformer. The equipment is based on Jinko Monocrystalline modules, Lorenze mounting structure, and SUNGROW inverters. This project generate aprox. 4600 kw daily.

Procurement of Solar Array (Supply, Install, Test and Commission of Grid-connected photo-voltaic power system) for JAIP in Jericho

Procurement of Solar Array (Supply, Install, Test and Commission of Grid-connected photo-voltaic power system) for JAIP in Jericho

More Photos PDF File
Location:Jericho
Owner:PIEFZA
Finance:UNDP-Japan Governate
Clients:UNDP
Value: $1,700,000
Starting On: 2019
Ending On: July 2020
Duration: 1.2 Year

Procurement of Solar Array 2 MW (Supply, Install, Test and Commission of Grid-connected photovoltaic power system) for JAIP in Jericho. The project involves the installation of approximately 5800 Photovoltaic (PV) solar panels on the roof of hangers and ground, which will have an energy generation capacity of 2 MW. The proposed works include; Civil and infrastructure activities, erection of scaffolding, installation of mounting structures, PV panels, inverters and cabling, training and commissioning.

Rehabilitation of Alfahes Road Stage 1

Rehabilitation of Alfahes Road Stage 1

More Photos PDF File
Location:Hebron City
Owner:Hebron Municipality
Finance:Hebron Municipality
Clients:Hebron Municipality
Value: 2,300,000 $
Starting On: 2019
Ending On: November 2020
Duration: 1 Year

Rehabilitation of road section of 740-meter length at Hebron city. The rehabilitation of the road section includes Sewer system and Storm water System with 2m diameter of concrete pipes, The works also includes the following components: - Excavation work and Soil replacement by two topping layers. - Asphalt binder and wearing course layer - Road marking, traffic signs, sidewalks and medians with interlock tile. - Storm water pipe line along road section with required catch basins and water pipe lines along the road including chambers, service boxes, gate valves RAV, Washouts…etc.

Jericho Gate Trunk Sewer line

Jericho Gate Trunk Sewer line

More Photos PDF File
Location:Jericho
Owner:Jericho Gate
Finance:Jericho Gate
Clients:Jericho Gate
Value: 456,000 $
Starting On: 2019
Ending On: October 2018
Duration: 10 Months

The project scope of work consists of the below:- Built 2.100 km of Trunk Sewers from Jericho Gate to wastewater treatment plant, (approximately 100Lm are steel pipes and the remaining sewer segments are DN400 UPVC pipes (SN8). In addition to construction of seven supporting columns in the Wadi supporting proposed steel bridge crossing The Wadi and carrying steel sewer pipes.

Jericho Gate Elevated and Underground Reservoirs.

Jericho Gate Elevated and Underground Reservoirs.

More Photos PDF File
Location:Jericho
Owner:Jericho Gate
Finance:Jericho Gate
Clients:Jericho Gate
Value: 766,500 $
Starting On: 2019
Ending On: November 2019
Duration: 1 Year

The project scope of work consists of the below:- Jericho Gate City has three existing wells, which will supplied water to 500-m³ underground reservoir, after implementation of future desalination plant the potable water will be pumped to 500m3 elevated reservoir. The elevated reservoir will have another source of potable water from Mekorot by transmission pipeline. The construction of both reservoirs being part of future potable and irrigation system to serve future Jericho Gate population.

Construction internal roads in Dura city.

Construction internal roads in Dura city.

More Photos PDF File
Location:Hebron-Dura
Owner:Dura Municipality
Finance:Dura Municipality
Clients:Dura Municipality
Value: 257,000$
Starting On: 2019
Ending On: November 2019
Duration: 5 Months

Reconstruction of 2.5 km of two-lane main road that starts at dura hospital. The roadway work consist of constructing a divided road with sidewalks, drainage system with inlets and storm piping, street lighting, reinforced concrete retaining walls, pavement markings, traffic signs, and all other required roadway elements. Milling and overlay of 1.3 km road; the work consists of milling and overlay of the existing road, pavement marking, traffic signs and all other required work.

Dura Water Project -AID-294-TO-17-00007

Dura Water Project -AID-294-TO-17-00007

More Photos PDF File
Location:Hebron-Dura
Owner:Palestinian Water Authority
Finance:USAID
Clients:USAID
Value: 4,142,000 $
Starting On: 2018
Ending On: November 2018
Duration: 1 Year

The project scope of work consists of the below:- Construction of New Dura at-grade Reservoir with a Capacity of 2,000 m³: Site levelling, excavation, backfilling, furnish and install retaining walls, reservoir concrete foundation, walls, column and slab concrete with all related civil, architectural, mechanical and electrical works, site preparation, asphalting, supply and install of fence, gate, and ladders, electrical utility power supply, duct banks, PLC components and instrumentation, valves and fittings, as well as other work needed to complete this project as specified in the contract documents. Construction of New Dura Main Transmission Pipelines, approximately 1.50 km. Expansion of Dura Distribution Network Pipelines, approximately 4.40 km.

Karma Water Project -AID-294-TO-17-00001

Karma Water Project -AID-294-TO-17-00001

More Photos PDF File
Location:Hebron-Karma
Owner:Palestinian Water Authority
Finance:USAID
Clients:USAID
Value: 2,490,000 $
Starting On: 2018
Ending On: November 2018
Duration: 1 Year

The scope of work consists of construction a new transmission main, distribution pipelines and an Elevated 500 M3 reservoir. Transmission Pipelines and Distribution Pipelines: 1. Karma Main Transmission Pipelines, approximately 275 lm. 2. Karma Distribution Network Pipelines, approximately 8.25 km. Water Reservoirs 500 M³ in Karma: Site levelling, excavation, backfilling, furnish and install retaining walls, reservoir concrete foundation, walls, column and slab concrete with all related civil, architectural, mechanical and electrical works, site preparation, asphalting, supply and install of fence, gate, and ladders, electrical utility power supply, duct banks, PLC components and instrumentation, valves and fittings, as well as other work needed to complete this project as specified in the contract documents.

Yatta distribution network rehabilitation and extension project- AID-294-TO-17-00005

Yatta distribution network rehabilitation and extension project- AID-294-TO-17-00005

More Photos PDF File
Location:Hebron-Yata
Owner:Palestinian Water Authority
Finance:USAID
Clients:USAID-BLUMONT
Value: 11,702,767$
Starting On: 2018
Ending On: February 2019
Duration: 1.5 Year

- Construction of Transmission Mains and Connection Chambers : 1- (Construction of approximately 6.0 km of steel transmission pipeline as an extension for the existing 20-inch ductile iron pipeline to Beit Amra proposed Reservoir and Kahllet Saleem proposed Reservoir). 2- Construction of approximately 6.0 km of steel transmission pipeline to supply Yatta Reservoirs from Al Reheya Well and PWA System. 3- Construction of 7 Connection Chambers between proposed and existing pipelines. - Distribution Networks, Reservoirs & House Connections: 1- Construction of a new 1000 m3 at grade reservoir in Schools Area. 2- Construction of a new 5000 m3 at grade reservoir in Kahllet Saleem. 3- Construction of a new 500 m3 elevated reservoir in Beit Amra. 4- Construction of approximately 50 km of distribution network pipes.

Finishing Works for First Floor In Red Crescent Hospital – Halhul

Finishing Works for First Floor In Red Crescent Hospital – Halhul

More Photos PDF File
Location:Hebron-Halhul
Owner:Red Crescent
Finance:Taawon
Clients:Taawon
Value: 652,000 $
Starting On: 2018
Ending On: February 2019
Duration: 1 Year

Finishing works for New floor with 1200m2 (Civil, Mechanical, Electrical). 1. Civil and architectural works include plastering, tiles, false ceiling, carpentry works, aluminum works, curtain walls, insulation works. 2. Electrical work includes main boards, sub-cables, lighting units, sound system, paging, fire systems, telephone networks and computer. 3. Mechanical works include hot and cold-water networks, HDPE pipes, air conditioning, medical gases, supply of medical gas taps and gas distribution network.

Mahmoud Abbas Governmental Hospital- Halhul

Mahmoud Abbas Governmental Hospital- Halhul

More Photos PDF File
Location:Hebron-Halhul
Owner:Ministry of Health
Finance:Italian Govern
Clients:Ministry of Health
Value: 5,276,000 $
Starting On: 2018-August
Ending On: October 2020
Duration: 2 Years

Halhul Hospital consists of 58 beds with approximate area 6320.66 m2 distributed on 4 floors (Basement, Ground, First, and second Floor), with total area 5132, located in the west of Halhul city and North west from the Halhul Municipality, the site located on a flat hill 1000m height from the sea level. The overall purpose of this project is to meet its people increasing demand on the health service, especially in Halhul that has big population, and to increase the clinical capacity providing well-designed Hospitals, so the Ministry of Health "Contracting Authority" in Collaboration with Italian Government (MAE-DGCS) "Donor" intend to construct this Hospital (Halhul Hospital).

Aljabaa Secondary boy School- Contract # CD5-SA-SWB-106

Aljabaa Secondary boy School- Contract # CD5-SA-SWB-106

More Photos PDF File
Location:Hebron-Jabaa
Owner:Ministry of Education
Finance:USAID
Clients:USAID-ANERA
Value: 1,200,000 $
Starting On: 2018
Ending On: February 2019
Duration: 5 Months

The school had both vertical and horizontal area added; with a total area of 1052 m².The, finished facility had three level structure. The work includes construction of a playground with sitting areas and pergola, maintenance and improvement of the yard and the green area by cover the floors with various suitable tiles, trees, plants and concrete benches, providing the new wing with solar panels on the top of the new school and reconstruction of the boundary wall including adding the fence above it.

Jaba-Nuba Transmission Main Phase II Project

Jaba-Nuba Transmission Main Phase II Project

More Photos PDF File
Location:Hebron / Surif and Kharas
Owner:Palestinian Water Authority
Finance:USAID
Clients:AECOM
Value: $7,794,475.37
Starting On: 2017
Ending On: 1/2018
Duration: 13-Month

This project includes constructing new transmission pipelines, rehabilitating an existing transmission pipeline, constructing new distribution pipelines, constructing new service connection chambers, improving existing water reservoirs, and constructing new booster pump stations.
This project includes the following elements:
A. Construction of new facilities:
1. Surif Booster Station – New booster station including a 250 m3 break tank.
2. Kharas Booster Station – New booster station including a 250 m3 break tank.
B. Construction of new transmission pipelines and distribution pipelines:
1. Surif Transmission Pipeline (2.6 km)
2. Kharas Transmission Pipeline (2.2 km)
3. Surif Distribution Pipeline (6.2 km)
4. Kharas Distribution Pipeline (4.5 km)
5. Nuba Distribution Pipeline (0.1 km)
6. Hitta Distribution Pipeline (0.2 km)
7. Beit Ula Distribution Pipeline (0.2 km)
C. Improving existing water reservoirs:
1. Nuba Existing Reservoir
2. Surif Existing Reservoir
3. Kharas Existing Reservoir
D. Rehabilitation of existing transmission pipeline:
1. Nuba – Beit Ula (9.5 km)

Construction of Livestock Market in Al-Dahiriyah

Construction of Livestock Market in Al-Dahiriyah

More Photos PDF File
Location:Hebron-Aldahria
Owner:Aldahria Municipality
Finance:FAO
Clients:FAO
Value: 421,000 $
Starting On: 2017
Ending On: November 2017
Duration: 1 Year

Construction of Livestock Market in Al-Dahiriyah including service building and Quarantine room and Examination Room and Guard Room with septic tanks and all steel structural works including canopy (steel shed). Civil and architectural works include plastering, tiles, false ceiling, carpentry works, Aluminum works, curtain walls, insulation works, and steel doors. Electrical work includes main boards, sub-cables, and lighting units. Mechanical works include hot and cold-water networks, HDPE pipes, air conditioning. Works.

Construction of Tubas, Aqqaba, Tayasir  Water Supply Project

Construction of Tubas, Aqqaba, Tayasir Water Supply Project

More Photos PDF File
Location:Jenin-Tubas
Owner:Palestinian Water Authority.
Finance:AFD
Clients:Palestinian Water Authority
Value: 3,098,116$
Starting On: 2016
Ending On: 3/2017
Duration: 12-Months

The project area is located in Tubas District and incorporating works in Tubas, Aqqaba and Tayaseer. The project aims to develop and enhance the water supply service to residents of these communities. The works in each of the above-mentioned communities include the followings:
1- Tubas Water System:
• Supply and installation of about 280m Ductile iron pipe 100mm diameter and about 5.7km of HDPE of diameter 63mm as replacement and extension of main pipelines.
• Supply and installation of about 10km of HDPE of diameters 32mm and 25mm as connecting pipelines to residential buildings.
• Supply and installation of about 3,500 prepaid water meters.
• Supply and installation of Vending Station with all required ITs equipments and units and softwares.
2- Aqqaba Water System
• Supply and installation of about 1,910m DIP of diameter 100mm and about 1.84km of HDPE of diameter 63mm as replacement and extension main pipelines.
• Supply and installation of about 2.25km of HDPE of diameters 32mm and 25mm as connecting pipelines to residential buildings.
• Construction of fiberglass ready-made water tanks of 50m3 capacity
• Construction of new booster station including civil and electromechanical works.
• Supply and installation of about 1,200 prepaid water meters.
• Supply and installation of Vending Station with all required ITs equipments and units and softwares.
3- Tayaseer Water System
• Supply and installation of about 1.5km of DIP 100mm and about 8.9km of HDPE of diameter 63mm as new pipelines.
• Supply and installation of about 7km of HDPE of diameters 32mm and 25mm as connecting pipelines to residential buildings.
• Supply and installation of about 700 prepaid water meters.
• Supply and installation of Vending Station with all required ITs equipments and units and softwares.

Southwest Nablus Water Supply Villages and Azawya Network

Southwest Nablus Water Supply Villages and Azawya Network

More Photos PDF File
Location:Nablus
Owner:Palestinian Water Authority.
Finance:USAID
Clients:IRD
Value: $7,648,143.88
Starting On: 2013
Ending On: 9/2014
Duration: 15-Month

This project consists of supplying and installing approximately 10 Km of transmission pipelines to connect the existing Burin reservoir with the three new reservoirs; construct three new water storage reservoirs, 500m3 each, in Madama, Asira Al Qibliya and Urif villages and construct three new water distribution networks in Madama, Asira Al Qibliya, and Urif Villages including furnishing complete the house connection for the three villages. The period of performance for Project 1. Southwest Nablus Villages is (450) Days, the Period of performance for Project 2, Az Zawieh Network is (300) Days

 Regional Wastewater Disposal Tulkarem - LOT 2

Regional Wastewater Disposal Tulkarem - LOT 2

More Photos PDF File
Location:Tulkarem
Owner:JSC- Tulkarem Muncipality.
Finance:KFW.
Clients:Gamma & Al Mutaheda Company
Value: 2,807,037$
Starting On: 2013
Ending On: 1/2014
Duration: 24- Months

Tulkarem project composed of (23) Km of concrete and PVC pipes with diameters, 300, 400,500,600,700, and 1000mm lines, the works of this projects includes also the construction of pump station, septic receiving and storage facility, screening plant, grit chamber and administration building and a new sewage pumping station at the site of old wastewater treatment plant.

"Well Flow Monitoring Project"

More Photos PDF File
Location:West Bank
Owner:West Bank Water Department
Finance:USAID
Clients:CDMsmith
Value: $659,818.04
Starting On: 2013
Ending On: 8/2014
Duration: 12-Months

The Work to be performed under this task order consists of construction of a well flow monitoring system for 48 potable water wells located at sites throughout the West Bank and transmission of the flow monitoring data to a central control room to be located in the West Bank Water Department’s (WBWD) operations headquarters in the City of Ramallah. Figures 01015 - F1 and 01015 - F2 show the project location in terms of the WBWD operations headquarters and the 48 wells. The 48 project wells are located throughout the West Bank; in the District Governances of; Bethlehem, Hebron, Jenin, Nablus, Qalqilya, Ramallah, Tubas, and Tulkarem. The flow monitoring and data transmission will be accomplished through the provision of a supervisory control and data acquisition (SCADA) system.

Qabatiya Well Pump Station & Qabatiya Conveyance

Qabatiya Well Pump Station & Qabatiya Conveyance

More Photos PDF File
Location:Jenin-Qabatiya
Owner:Palestinian Water Authority.
Finance:USAID
Clients:CDMsmith
Value: $3,353,909.78
Starting On: 2013
Ending On: 3/2016
Duration: 34-Months

This project consists of constructing, installing and equipping a new pump station for the existing Qabatiya Well. In addition, the project includes installing a conveyance system that connects Qabatiya Well to Al Zababida junction.

Infrastructure works for Hai1+Hai2, & Edge, Backbone and the Reservoir

Infrastructure works for Hai1+Hai2, & Edge, Backbone and the Reservoir

More Photos PDF File
Location:Rawabi City- Ramallah
Owner:Rawabi
Finance:Bayti / Rawabi
Clients:Bayti / Rawabi
Value: 5,787,691 $
Starting On: 2012
Ending On: 8/2014
Duration: 24- Months

1. Construction of the Infrastructure facilities of Rawabi city; Backbone, Wet utilities, and Reservoirs. a. Phase I: Including Water system, and pumping layouts, Wastewater pipelines, irrigation system, and drainage system. Works including construction of Concrete tank; 5000m3 each, construction of steel pipes, concrete pipes, and UPVC pipes for diameter up to DN500mm. b.Phase II: Works include the construction of treated water pumping station, drinking water pumping station, including PLC control, switch gears, and electrical panels.

 Construction of New Internal Network in Tammoun-Tubas District.

Construction of New Internal Network in Tammoun-Tubas District.

More Photos PDF File
Location:Tammoun
Owner:Palestinian Water Authority.
Finance:AFD
Clients:Palestinian Water Authority.
Value: $3,135,926
Starting On: 2012
Ending On: 7/2013
Duration: 12-Months

The work under this project includes Supply and installation of approx. 98,000 LM of Ductile Iron Main water pipeline and internal network including, fittings, vaults, and Associated facilities. -Construction of 8 Km of DI conveyance system Dia 300mm and 200mm, -Construction of 60 Km of HDPE pipelines for dia 110-63mm -Construction of 30,000 LM of House connections. -Construction of 2100 prepaid water meters for house connections.

 Rehabilitation & Expansion of Three Water Infrastructure Projects.

Rehabilitation & Expansion of Three Water Infrastructure Projects.

More Photos PDF File
Location:Hebron Villages
Owner:Palestinian Water Authority
Finance:EU
Clients:Palestinian Water Authority
Value: 1,758,697.4$
Starting On: 2012
Ending On: 11/2012
Duration: 12-Months

1. Rehabilitation And Expansion Of Water Network For Saier Municipality 9km of Steel Pipes 2’’,3’’,4’’,6’’.
2. Rehabilitation And Expansion Of Water Network in AL-Dahiriyah Municipality 19 km of Steel Pipes 2’’,3’’,4’’.
3. Construction of 6’’ with amount of 3880m & 620 m 4’’ water main line and 1000m3 Ground Reservoir in Surif –Hebron District.
In addition to construction of manholes for washout & air release valve chambers & gate valve & pressures reducing valve.

Water Reservoirs projects

Water Reservoirs projects

More Photos PDF File
Location:West Bank
Owner:Palestinian Water Authority.
Finance:USAID
Clients:ApcoarCon
Value: $5,622,118.00
Starting On: Earlier
Ending On: 4/2011
Duration: 15-Month

Construction of 6 concrete reservoirs and water transmission systems in west bank: •Yatta Reservoir: 4000m3 with 16” &12”/ 1000 LM transmission pipeline & and 1km of road construction. •Abu Hilal Reservoir: 2000m3 reservoir with 16”/3000LM of transmission pipeline, and 1KM of road construction. •Sanjar Reservoir: Construction of elevated 500m3 Reservoir, with 8”/1000LM of transmission pipeline. •Ein Senia Reservoir: Construction of 1000m3 Reservoir with4”/1200LM of transmission pipeline, and 1 KM of road construction •Luban Reservoir: construction of elevated 500m3 Reservoir with 4”/1000 LM of transmission pipeline, and 1KM of road construction. •Zeita Reservoir: Construction of elevated 500m3 reservoirs. All reservoirs included the construction of washout manholes, construction of main connections, air valves, gate valves, and house connections.

 Main Pipeline And Deir Samit Reservoir

Main Pipeline And Deir Samit Reservoir

More Photos PDF File
Location:Hebron / DierSamit
Owner:Palestinian Water Authority.
Finance:USAID
Clients:ApcoArCon
Value: $2,470,400.00
Starting On: Earlier
Ending On: 10/2010
Duration: 12-Months

Construction of Main transmission pipeline from Tarqumia to Dier Samit with the following details . Construction of 10200 LM of 12(inch) Ductile Iron Pipelines for main transmission . Construction of 2300 LM of 8(inch) Ductile Iron Pipeline for Idna Reservoir . Construction of 2000m3 Concrete reservoir for Deir Samit Town. Including the construction of washout manholes, construction of main connections, air valves, gate valves .

 Distribution Network for Beit Awwa & Alkom

Distribution Network for Beit Awwa & Alkom

More Photos PDF File
Location:Hebron /BietAwwa-Alkom
Owner:Palestinian Water Authority.
Finance:USAID
Clients:ApcoArCon
Value: $3,842,584.00
Starting On: Earlier
Ending On: 10/2010
Duration: 15-Month

Construction of internal network for 2 villages including: supply and installation of 20,000M of 2” steel pipes; supply and installation of 5000 M of 3” steel pipes; supply and installation of 9500 M of 4” steel pipes; Supply and installation of 7000 m of 6” steel pipes including the construction of washout manholes, construction of main connections, air valves, gate valves, & house connections.

Construction of steel structures, fabrication of machinery.

Construction of steel structures, fabrication of machinery.

More Photos PDF File
Location: Hebron / Dura - Aldahriya
Owner:Arab Group Inv.
Finance:Arab Group Inv.
Clients:Future Iron Pipes (FIP).
Value: $ 3,350,000
Starting On: Earlier
Ending On: 2/2010
Duration: 12-Months

The work included the construction of steel structures, overhead crane, installing high voltage transformers, and power lines, construction of power panels, electricity & power cables, Installation and commissioning of machines, and fabrication of machine foundations. This is a unique project in Palestine and considered as a private investment of the main shareholders of Arab Brothers

SAFE IN OUR HANDS...
The best corporate in construction business in Palestine..

News

Arab Brothers acknowledges its achievement in completing AID-294-TO-16-00005 Jaba Nuba Transmission Phase II; on time, and that too in an efficient way. All works on this Contract including 2 pumping stations, 18km of Steel pipes, Read More

Partnering with Palestine Polytechnic University is a wise investment for our cooperate pertaining our social responsibility towards our community and Nation. We believe that Scholarships and faculty support strengthens the Uni Read More

Arab Brothers has signed a contract for constructing a new internal water networks in Dahriah Town, South of Hebron, Palestine. The Project aims to install over 16Km of new pipes, and house connections. The Project is implemented Read More

"Stay with us to follow the latest News and Events"

NewsLetter

'Stay with us to follow the latest News and Events', Just write your email in box, then inboxed your email everytime.

Please provide valid email address.

Group Companies

Arab Brothers Group has the passion to cater to the infrastructural development of Palestine and the surrounding markets by providing an assorted range of integrated services to the construction industry. In the past 20 years, The Group has diversified itself by forming individual groups of companies, each operating independently and specializing in its field of expertise. Following a tradition of corporate excellence throughout its operations, Arab Brothers emphasizes performance and exceeds customer expectations through innovation, efficiency and reliability. Arab Brothers’ sister companies include:

Systems for Mechanical Applications (SMA)

SMA is dedicated to serve customers in the infrastructure market with a wide range of pipes, valves, pumps, and fittings both for domestic and industrial applications. SMA offers products from many manufacturers and have experienced sales staff effectively follow up customer demands. From inquiry to delivery, SMA team prides itself in quick and accurate processing of inquires & orders. SMA carries a large amount of inventory of Pipes, Fittings, and accessories for wide range of municipal and industrial applications. SMA offers, onsite inventory management programs and mobile warehouses. The Engineering service support provided by SMA, the field support, and the accurate delivery schedules, and the leading international partners have all made SMA the preferable one stop-Shop for most of infrastructure products. SMA is representing the largest global manufacturers in this business, including GF, VAG, and Itap. For more information about SMA, please visit our website: www.sma.ps.

Future Iron Pipes (FIP)

FIP offers protective coatings and lining for steel pipes up to 400 mm. Our coated products are in use on major projects in Palestine, Jordan, and other Middle Eastern Countries. The company provides a wide range of external coating applications including 3LPE, 3PP, FBE, FBP, in compliance with national and international standards PS, AWWA, DIN, ASTM, and other specific requirements. Pipes above and include 80mm are internally coated with cement mortar lining in compliance with AWWA-C205, and NSF-61 standards. The Production facility is implementing stringent quality measures in compliance with ISO9001 standards. For More information, click on www.fip.ps.

Contact Us

Say Hello

Please enter name.
Please enter valid email adress.
Please enter your comment.
Hebron Main Branch

Kurza, Dura, Hebron, WB,
Palestine

Tel:+970-2-2260080
Fax: +970-2-2286707