Our group is active in many fields as a multidisciplinary and innovative contractor since over 20 years:

service 1

Infrastructure Projects

Real Estate

Industrial Projects

RECENT PROJECTS

All Projects in PDF


Local Construction Program (LCP), Implemented by USAID

Arab Brothers was recently awarded an Indefinite Quantity Contract for construction services with USAID. This five-year, multiple-award contract allocates $ 300,000,000 estimated budget. It is administered by USAID. LCP implements small- and medium-scale infrastructure activities in the West Bank to improve infrastructure across multiple sectors, resulting in safer roads better schools and health clinics, and improved access to water and sanitation services for Palestinians in the West Bank. Read More

Improving access to water in Rural Palestine, in partnership with ACF International, 2016

Arab Brothers had proven exceptional performance in Emergency projects aiming to improve access to clean water in rural communities in Palestine. In May 2016 Arab Brothers was awarded two projects, in Tubas Area, Northern West Bank, and Dahriah, Southern West Bank. The objective of these projects was improving the quality and quantity of water supply in two selected priority governorates through rehabilitating and upgrading water supply and distribution schemes. Read More

Jaba-Nuba Transmission Main Phase II Project

Jaba-Nuba Transmission Main Phase II Project

More Photos PDF File
Location:Hebron / Surif and Kharas
Owner:Palestinian Water Authority
Finance:USAID
Clients:AECOM
Value: $7,794,475.37
Starting On: 2017
Ending On: 1/2018
Duration: 13-Month

This project includes constructing new transmission pipelines, rehabilitating an existing transmission pipeline, constructing new distribution pipelines, constructing new service connection chambers, improving existing water reservoirs, and constructing new booster pump stations.
This project includes the following elements:
A. Construction of new facilities:
1. Surif Booster Station – New booster station including a 250 m3 break tank.
2. Kharas Booster Station – New booster station including a 250 m3 break tank.
B. Construction of new transmission pipelines and distribution pipelines:
1. Surif Transmission Pipeline (2.6 km)
2. Kharas Transmission Pipeline (2.2 km)
3. Surif Distribution Pipeline (6.2 km)
4. Kharas Distribution Pipeline (4.5 km)
5. Nuba Distribution Pipeline (0.1 km)
6. Hitta Distribution Pipeline (0.2 km)
7. Beit Ula Distribution Pipeline (0.2 km)
C. Improving existing water reservoirs:
1. Nuba Existing Reservoir
2. Surif Existing Reservoir
3. Kharas Existing Reservoir
D. Rehabilitation of existing transmission pipeline:
1. Nuba – Beit Ula (9.5 km)

Construction of Tubas, Aqqaba, Tayasir  Water Supply Project

Construction of Tubas, Aqqaba, Tayasir Water Supply Project

More Photos PDF File
Location:Jenin-Tubas
Owner:Palestinian Water Authority.
Finance:AFD
Clients:Palestinian Water Authority
Value: 3,098,116$
Starting On: 2016
Ending On: 3/2017
Duration: 12-Months

The project area is located in Tubas District and incorporating works in Tubas, Aqqaba and Tayaseer. The project aims to develop and enhance the water supply service to residents of these communities. The works in each of the above-mentioned communities include the followings:
1- Tubas Water System:
• Supply and installation of about 280m Ductile iron pipe 100mm diameter and about 5.7km of HDPE of diameter 63mm as replacement and extension of main pipelines.
• Supply and installation of about 10km of HDPE of diameters 32mm and 25mm as connecting pipelines to residential buildings.
• Supply and installation of about 3,500 prepaid water meters.
• Supply and installation of Vending Station with all required ITs equipments and units and softwares.
2- Aqqaba Water System
• Supply and installation of about 1,910m DIP of diameter 100mm and about 1.84km of HDPE of diameter 63mm as replacement and extension main pipelines.
• Supply and installation of about 2.25km of HDPE of diameters 32mm and 25mm as connecting pipelines to residential buildings.
• Construction of fiberglass ready-made water tanks of 50m3 capacity
• Construction of new booster station including civil and electromechanical works.
• Supply and installation of about 1,200 prepaid water meters.
• Supply and installation of Vending Station with all required ITs equipments and units and softwares.
3- Tayaseer Water System
• Supply and installation of about 1.5km of DIP 100mm and about 8.9km of HDPE of diameter 63mm as new pipelines.
• Supply and installation of about 7km of HDPE of diameters 32mm and 25mm as connecting pipelines to residential buildings.
• Supply and installation of about 700 prepaid water meters.
• Supply and installation of Vending Station with all required ITs equipments and units and softwares.

Southwest Nablus Water Supply Villages and Azawya Network

Southwest Nablus Water Supply Villages and Azawya Network

More Photos PDF File
Location:Nablus
Owner:Palestinian Water Authority.
Finance:USAID
Clients:IRD
Value: $7,648,143.88
Starting On: 2013
Ending On: 9/2014
Duration: 15-Month

This project consists of supplying and installing approximately 10 Km of transmission pipelines to connect the existing Burin reservoir with the three new reservoirs; construct three new water storage reservoirs, 500m3 each, in Madama, Asira Al Qibliya and Urif villages and construct three new water distribution networks in Madama, Asira Al Qibliya, and Urif Villages including furnishing complete the house connection for the three villages. The period of performance for Project 1. Southwest Nablus Villages is (450) Days, the Period of performance for Project 2, Az Zawieh Network is (300) Days

 Regional Wastewater Disposal Tulkarem - LOT 2

Regional Wastewater Disposal Tulkarem - LOT 2

More Photos PDF File
Location:Tulkarem
Owner:JSC- Tulkarem Muncipality.
Finance:KFW.
Clients:Gamma & Al Mutaheda Company
Value: 2,807,037$
Starting On: 2013
Ending On: 1/2014
Duration: 24- Months

Tulkarem project composed of (23) Km of concrete and PVC pipes with diameters, 300, 400,500,600,700, and 1000mm lines, the works of this projects includes also the construction of pump station, septic receiving and storage facility, screening plant, grit chamber and administration building and a new sewage pumping station at the site of old wastewater treatment plant.

"Well Flow Monitoring Project"

More Photos PDF File
Location:West Bank
Owner:West Bank Water Department
Finance:USAID
Clients:CDMsmith
Value: $659,818.04
Starting On: 2013
Ending On: 8/2014
Duration: 12-Months

The Work to be performed under this task order consists of construction of a well flow monitoring system for 48 potable water wells located at sites throughout the West Bank and transmission of the flow monitoring data to a central control room to be located in the West Bank Water Department’s (WBWD) operations headquarters in the City of Ramallah. Figures 01015 - F1 and 01015 - F2 show the project location in terms of the WBWD operations headquarters and the 48 wells. The 48 project wells are located throughout the West Bank; in the District Governances of; Bethlehem, Hebron, Jenin, Nablus, Qalqilya, Ramallah, Tubas, and Tulkarem. The flow monitoring and data transmission will be accomplished through the provision of a supervisory control and data acquisition (SCADA) system.

Qabatiya Well Pump Station & Qabatiya Conveyance

Qabatiya Well Pump Station & Qabatiya Conveyance

More Photos PDF File
Location:Jenin-Qabatiya
Owner:Palestinian Water Authority.
Finance:USAID
Clients:CDMsmith
Value: $3,353,909.78
Starting On: 2013
Ending On: 3/2016
Duration: 34-Months

This project consists of constructing, installing and equipping a new pump station for the existing Qabatiya Well. In addition, the project includes installing a conveyance system that connects Qabatiya Well to Al Zababida junction.

Infrastructure works for Hai1+Hai2, & Edge, Backbone and the Reservoir

Infrastructure works for Hai1+Hai2, & Edge, Backbone and the Reservoir

More Photos PDF File
Location:Rawabi City- Ramallah
Owner:Rawabi
Finance:Bayti / Rawabi
Clients:Bayti / Rawabi
Value: 5,787,691 $
Starting On: 2012
Ending On: 8/2014
Duration: 24- Months

1. Construction of the Infrastructure facilities of Rawabi city; Backbone, Wet utilities, and Reservoirs. a. Phase I: Including Water system, and pumping layouts, Wastewater pipelines, irrigation system, and drainage system. Works including construction of Concrete tank; 5000m3 each, construction of steel pipes, concrete pipes, and UPVC pipes for diameter up to DN500mm. b.Phase II: Works include the construction of treated water pumping station, drinking water pumping station, including PLC control, switch gears, and electrical panels.

 Construction of New Internal Network in Tammoun-Tubas District.

Construction of New Internal Network in Tammoun-Tubas District.

More Photos PDF File
Location:Tammoun
Owner:Palestinian Water Authority.
Finance:AFD
Clients:Palestinian Water Authority.
Value: $3,135,926
Starting On: 2012
Ending On: 7/2013
Duration: 12-Months

The work under this project includes Supply and installation of approx. 98,000 LM of Ductile Iron Main water pipeline and internal network including, fittings, vaults, and Associated facilities. -Construction of 8 Km of DI conveyance system Dia 300mm and 200mm, -Construction of 60 Km of HDPE pipelines for dia 110-63mm -Construction of 30,000 LM of House connections. -Construction of 2100 prepaid water meters for house connections.

 Rehabilitation & Expansion of Three Water Infrastructure Projects.

Rehabilitation & Expansion of Three Water Infrastructure Projects.

More Photos PDF File
Location:Hebron Villages
Owner:Palestinian Water Authority
Finance:EU
Clients:Palestinian Water Authority
Value: 1,758,697.4$
Starting On: 2012
Ending On: 11/2012
Duration: 12-Months

1. Rehabilitation And Expansion Of Water Network For Saier Municipality 9km of Steel Pipes 2’’,3’’,4’’,6’’.
2. Rehabilitation And Expansion Of Water Network in AL-Dahiriyah Municipality 19 km of Steel Pipes 2’’,3’’,4’’.
3. Construction of 6’’ with amount of 3880m & 620 m 4’’ water main line and 1000m3 Ground Reservoir in Surif –Hebron District.
In addition to construction of manholes for washout & air release valve chambers & gate valve & pressures reducing valve.

Water Reservoirs projects

Water Reservoirs projects

More Photos PDF File
Location:West Bank
Owner:Palestinian Water Authority.
Finance:USAID
Clients:ApcoarCon
Value: $5,622,118.00
Starting On: Earlier
Ending On: 4/2011
Duration: 15-Month

Construction of 6 concrete reservoirs and water transmission systems in west bank: •Yatta Reservoir: 4000m3 with 16” &12”/ 1000 LM transmission pipeline & and 1km of road construction. •Abu Hilal Reservoir: 2000m3 reservoir with 16”/3000LM of transmission pipeline, and 1KM of road construction. •Sanjar Reservoir: Construction of elevated 500m3 Reservoir, with 8”/1000LM of transmission pipeline. •Ein Senia Reservoir: Construction of 1000m3 Reservoir with4”/1200LM of transmission pipeline, and 1 KM of road construction •Luban Reservoir: construction of elevated 500m3 Reservoir with 4”/1000 LM of transmission pipeline, and 1KM of road construction. •Zeita Reservoir: Construction of elevated 500m3 reservoirs. All reservoirs included the construction of washout manholes, construction of main connections, air valves, gate valves, and house connections.

 Main Pipeline And Deir Samit Reservoir

Main Pipeline And Deir Samit Reservoir

More Photos PDF File
Location:Hebron / DierSamit
Owner:Palestinian Water Authority.
Finance:USAID
Clients:ApcoArCon
Value: $2,470,400.00
Starting On: Earlier
Ending On: 10/2010
Duration: 12-Months

Construction of Main transmission pipeline from Tarqumia to Dier Samit with the following details . Construction of 10200 LM of 12(inch) Ductile Iron Pipelines for main transmission . Construction of 2300 LM of 8(inch) Ductile Iron Pipeline for Idna Reservoir . Construction of 2000m3 Concrete reservoir for Deir Samit Town. Including the construction of washout manholes, construction of main connections, air valves, gate valves .

 Distribution Network for Beit Awwa & Alkom

Distribution Network for Beit Awwa & Alkom

More Photos PDF File
Location:Hebron /BietAwwa-Alkom
Owner:Palestinian Water Authority.
Finance:USAID
Clients:ApcoArCon
Value: $3,842,584.00
Starting On: Earlier
Ending On: 10/2010
Duration: 15-Month

Construction of internal network for 2 villages including: supply and installation of 20,000M of 2” steel pipes; supply and installation of 5000 M of 3” steel pipes; supply and installation of 9500 M of 4” steel pipes; Supply and installation of 7000 m of 6” steel pipes including the construction of washout manholes, construction of main connections, air valves, gate valves, & house connections.

Construction of steel structures, fabrication of machinery.

Construction of steel structures, fabrication of machinery.

More Photos PDF File
Location: Hebron / Dura - Aldahriya
Owner:Arab Group Inv.
Finance:Arab Group Inv.
Clients:Future Iron Pipes (FIP).
Value: $ 3,350,000
Starting On: Earlier
Ending On: 2/2010
Duration: 12-Months

The work included the construction of steel structures, overhead crane, installing high voltage transformers, and power lines, construction of power panels, electricity & power cables, Installation and commissioning of machines, and fabrication of machine foundations. This is a unique project in Palestine and considered as a private investment of the main shareholders of Arab Brothers

SAFE IN OUR HANDS...
The best corporate in construction business in Palestine..

News

Arab Brothers acknowledges its achievement in completing AID-294-TO-16-00005 Jaba Nuba Transmission Phase II; on time, and that too in an efficient way. All works on this Contract including 2 pumping stations, 18km of Steel pipes, Read More

Partnering with Palestine Polytechnic University is a wise investment for our cooperate pertaining our social responsibility towards our community and Nation. We believe that Scholarships and faculty support strengthens the Uni Read More

Arab Brothers has signed a contract for constructing a new internal water networks in Dahriah Town, South of Hebron, Palestine. The Project aims to install over 16Km of new pipes, and house connections. The Project is implemented Read More

"Stay with us to follow the latest News and Events"

Out Clients

NewsLetter

'Stay with us to follow the latest News and Events', Just write your email in box, then inboxed your email everytime.

Please provide valid email address.

Sister Companies

Arab Brothers Group has the passion to cater to the infrastructural development of Palestine and the surrounding markets by providing an assorted range of integrated services to the construction industry. In the past 20 years, The Group has diversified itself by forming individual groups of companies, each operating independently and specializing in its field of expertise. Following a tradition of corporate excellence throughout its operations, Arab Brothers emphasizes performance and exceeds customer expectations through innovation, efficiency and reliability. Arab Brothers’ sister companies include:

Systems for Mechanical Applications (SMA)

SMA is dedicated to serve customers in the infrastructure market with a wide range of pipes, valves, pumps, and fittings both for domestic and industrial applications. SMA offers products from many manufacturers and have experienced sales staff effectively follow up customer demands. From inquiry to delivery, SMA team prides itself in quick and accurate processing of inquires & orders. SMA carries a large amount of inventory of Pipes, Fittings, and accessories for wide range of municipal and industrial applications. SMA offers, onsite inventory management programs and mobile warehouses. The Engineering service support provided by SMA, the field support, and the accurate delivery schedules, and the leading international partners have all made SMA the preferable one stop-Shop for most of infrastructure products. SMA is representing the largest global manufacturers in this business, including GF, VAG, and Itap. For more information about SMA, please visit our website: www.sma.ps.

Future Iron Pipes (FIP)

FIP offers protective coatings and lining for steel pipes up to 400 mm. Our coated products are in use on major projects in Palestine, Jordan, and other Middle Eastern Countries. The company provides a wide range of external coating applications including 3LPE, 3PP, FBE, FBP, in compliance with national and international standards PS, AWWA, DIN, ASTM, and other specific requirements. Pipes above and include 80mm are internally coated with cement mortar lining in compliance with AWWA-C205, and NSF-61 standards. The Production facility is implementing stringent quality measures in compliance with ISO9001 standards. For More information, click on www.fip.ps.

Contact Us

Loading map...

Say Hello

Please enter name.
Please enter valid email adress.
Please enter your comment.
Hebron Main Branch

Dura - Sinjer -Alrayan Building 2nd Floor

Tel:0097-2-2286808
Fax: 0097-2-2286707

Jenin Branch

Tubas - Near Department of Agriculture

Tel:0097-9-2574431
Fax: 0097-2-2286707